The third tranche of the Transport Access Program (TAP 3) built on earlier success by delivering comprehensive upgrades to existing ferry wharves across Sydney Harbour, strengthening access to public transport for people with disability, those with limited mobility, and parents and carers with prams.
In 2024, the TAP and CCP initiatives were brought together under a single, future-focused program: Safe Accessible Transport, reinforcing a long-term commitment to a more inclusive and user-centred network.
Aligned with the objectives of the second package of upgrades to Sydney Harbour’s ferry wharves, this project is focused on significantly enhancing accessibility, improving transport connectivity, and elevating safety and amenity for ferry customers.
These upgrades are especially important given the often steep and complex topography of many wharf locations, where well-considered design can transform the customer experience.
Kit of parts: expanded and extended
Several sites within this package required extensive landside works and the development of new “kit of parts” elements to address significant level changes between street access and berthing levels.
In response, the multidisciplinary consultant team of engineers, architects and planners developed a coordinated design language for new lifts, stairs, ramps and walkways that complements and extends the established visual identity of the Sydney ferry wharf network.
Banner and images above: South Mosman Wharf
Both images above: Greenwich Point Wharf
Both images above: Double Bay Wharf
Client:
Transport for NSW
Location:
Sydney, New South Wales
Managing contractor:
BESIX Watpac
Wharves:
North Sydney, Taronga Zoo, Double Bay, South Mosman, Greenwich Point
Status:
Built (2020 – 2025)
Contact Person:
Anderson Trieu
Anderson Trieu
Associate
Sydney
Registered Architect NSW (11307)